Showing 25–36 of 84 articles by Lokesh
Sizing & InstallationNetwork Charges on Rooftop Solar in Tamil Nadu: Who Pays, How Much, and How They Are Worked OutTamil Nadu charges rooftop solar owners for using the grid. The TNERC rates, the 20 percent domestic rate, the 50 percent MSME cut, and a worked example of the monthly cost.
Read more
Sizing & InstallationTamil Nadu Solar Energy Policy: What Actually Applies to Your Rooftop in 2026The 2019 state solar policy, the TNERC regulations that really govern rooftops, network charges, the 2024 draft rules and the new state top-up, in one place.
Read more
Sizing & InstallationPM Surya Ghar Last Date: Is the Scheme Ending, and What Happens After March 2027The scheme runs until 31 March 2027. What that date means for your application, what the extension reports say, the latest progress, and Tamil Nadu's new top-up.
Read more
Sizing & InstallationIs PM Surya Ghar Free? What "300 Units of Free Electricity" Actually MeansPM Surya Ghar does not give you 300 free units. It subsidises panels that make them. What you pay, how many units your roof produces in Tamil Nadu, and why the bill is not zero.
Read more
Sizing & InstallationPM Surya Ghar Complaint: How to Raise a Grievance, and Where Each Problem GoesHow to raise a PM Surya Ghar complaint on the portal or helpline 15555, the 30-day resolution rule, and which problems go to the vendor, the DISCOM or a consumer forum.
Read more
Sizing & InstallationPM Surya Ghar Agreement Format: What You Sign With Your Vendor, Clause by ClauseThe model agreement MNRE publishes for consumer and vendor, read clause by clause. What the vendor must do, what you must do, and what to add before you sign.
Read more
Sizing & InstallationPM Surya Ghar Vendor List: How to Find, Check and Choose a Registered VendorThe subsidy is only paid through a vendor registered on the National Portal. Where the vendor list is, what registration proves, what it does not, and how to choose.
Read more
Sizing & InstallationPM Surya Ghar Eligibility: Who Can Claim the Subsidy, and Who CannotThe scheme's actual eligibility rules from the MNRE guidelines: residential connection, DCR panels, grid connection. Tenants, SC/ST, age limit, second homes and businesses answered.
Read more
Sizing & InstallationLoom Solar: Everything You Need to Know in 2026The brand you buy online. What Loom Solar's Shark range costs per watt at listed prices, how its 25 to 30 year warranty reads, and what buying direct leaves out.
Read more
Sizing & InstallationSaatvik: Everything You Need to Know in 2026Ambala's fast-scaling maker, 4.8 GW and listed since 2025. What Saatvik's N-TOPCon range delivers, its 12/25 warranty, and where it fits against Waaree.
Read more
Sizing & InstallationRayzon Solar: Everything You Need to Know in 2026From 40 MW in 2017 to 11.3 GW. What Rayzon Solar's TOPCon range delivers, how its 30-year performance warranty reads, and where the Surat maker fits.
Read more
Sizing & InstallationEmmvee: Everything You Need to Know in 2026Bengaluru's integrated maker, 10.3 GW of modules and 2.94 GW of own cells, listed since 2025. What Emmvee's TOPCon range delivers and who it suits.
Read more
