Blues Renewables
+91 98841 07170 Free assessment
Rooftop solar panel array in Chennai priced per kilowatt
Solar panel price in Chennai →

Installed cost per kW, what the ₹78,000 subsidy leaves you paying, and payback by system size.

Not sure which size? The calculator sizes it from your bill in two clicks.

Open the solar calculator
Residential rooftop solar installation on a Chennai house terrace
Residential solar →

Rooftop systems for Chennai homes, sized against your bill and your sanctioned load.

Commercial rooftop solar arrays across warehouse roofs in Chennai
Commercial solar →

Higher tariffs, accelerated depreciation and green audit certification. Usually a faster payback than a home.

Installation team fixing solar panels on a rooftop in Tamil Nadu
Solar solutions →

On-grid, off-grid or hybrid. Which one your site actually calls for.

Solar lighting →

Standalone lighting for gated communities, factory perimeters, schools and layouts. No meter, no TANGEDCO file.

Rooftop solar array in Chennai claimed under the PM Surya Ghar subsidy
Subsidy and approvals →

Up to ₹78,000 from PM Surya Ghar, and the TANGEDCO file we handle for you.

Rooftop solar installation in Chennai eligible for the PM Surya Ghar subsidy PM Surya Ghar in Tamil Nadu ₹30,000 / ₹60,000 / ₹78,000 slabs Rooftop solar installation connected under TANGEDCO net metering TANGEDCO net metering Four to eight weeks, filed by us Homeowner reviewing solar subsidy documents with an engineer Eligibility and documents What to keep ready before applying
! A state top-up to ₹1 lakh was announced on 5 August 2026 but is not claimable yet. The checklist below is the PM Surya Ghar and TANGEDCO file.
Solar engineer reviewing rooftop generation data on a tablet

Calculators

Work out size, cost and return before you speak to anyone.

Rooftop solar installation in Chennai by Blues Renewables
All areas in Chennai →

What changes from one part of the city to the next, and which areas we survey.

Coverage across Tamil Nadu →

Your area not listed? We survey across the whole city and metropolitan area.

Call +91 98841 07170
Call +91 98841 07170
Last updated: August 2026

Documents Required for Solar Subsidy in Tamil Nadu

Everything you need for the PM Surya Ghar subsidy application and the TANGEDCO net metering application, in one list. Plus what to do in the three situations that actually stop applications: the connection in someone else's name, unclear property ownership, and a bank account that does not match.

Homeowner going through rooftop solar subsidy documents with an engineer
Documents checked with the homeowner before the application goes in.

The short list

What you need, in brief

To claim the PM Surya Ghar subsidy in Tamil Nadu you need your electricity bill or consumer number, identity proof, proof that you own the property or have rights to the roof, and bank account details with a cancelled cheque for the subsidy transfer. The electricity connection must be in the applicant's name, and the bank account name must match. Housing societies apply with additional association documents.

Which list applies to you

A household

Seven documents. The list below is complete for an individual applicant.

A housing society

The same seven, plus association registration, the general body resolution and authorisation for the signatory.

Tenants cannot apply without the owner. The edge cases cover joint names, inherited property and flats.

The core list

{{ tickCount }}

Two conditions that matter more than any document

  • The electricity connection must be in the applicant's name
  • The bank account name must match the applicant name

Document requirements are set by the national portal and by TANGEDCO and are periodically revised. Check the current list on pmsuryaghar.gov.in at the time you apply. This page is reviewed quarterly.

New · 5 August 2026

A state top-up was just announced. It does not change this checklist yet.

In the Tamil Nadu Revised Budget 2026–27, presented on 5 August 2026, the government announced a Rooftop Solar Subsidy Scheme in convergence with PM Surya Ghar, taking total support to up to ₹1 lakh for a domestic 3 kW rooftop system against the ₹78,000 the central scheme pays alone. ₹50 crore has been allocated for the year.

For anyone gathering paperwork today, the practical position is simple: nothing on this page changes. The documents below are what the PM Surya Ghar claim and the TANGEDCO net metering application require, and both still have to be filed exactly as set out.

If the state scheme asks for anything additional, it will almost certainly be documents you have already assembled for the central claim. Getting this file right now is the same work either way.

₹1,00,000

Announced

Total support for a domestic 3 kW system

₹78,000

Claimable today

PM Surya Ghar, unchanged

₹50 crore

Allocated

For the year, so likely first-come

What is still unpublished

Whether the state asks for any document the central claim does not

Whether it is claimed on the same national portal or a separate state route

The eligibility conditions, and the start date

How the ₹50 crore is rationed once applications open

We track the government order weekly while this is new, and we tell you where it stands in the week you install rather than quoting a number nobody can claim yet. The full position is set out on the subsidy page.

In order

What is needed, and when

Four stages, in the order they happen. Only two of them are your paperwork — the readiness report and technical documentation come from your installer, and the commissioning certificate is generated on the portal. Knowing which is which saves a lot of chasing.

Stage 01

The subsidy application

You provide
  • Electricity consumer number, from your bill
  • Identity proof of the applicant
  • Mobile number and email for portal registration
  • Property ownership proof — sale deed, property tax receipt or patta

Stage 02

The TANGEDCO net metering application

You and your installer
  • Latest electricity bill
  • Identity and ownership proof
  • Proposed system capacity and technical details, prepared by your installer
  • Installer and equipment details
  • Sanctioned load details from your connection

Your installer prepares the technical portions. Your part is signing and providing the connection and ownership documents. How the application runs.

Stage 03

After installation

Your installer
  • Readiness report, confirming the plant is complete
  • Installation and equipment documentation, including panel make, model and DCR certificate
  • Test reports as required at inspection

Stage 04

Subsidy disbursal

You and the portal
  • Bank account details, in the applicant's name
  • Cancelled cheque or passbook copy
  • Commissioning certificate, generated on the portal after inspection and metering

For housing societies and RWAs, additionally

Everything above still applies. These five sit on top of it, and the resolution is usually the item that sets the timeline rather than any document we can prepare for you.

Solar for apartments and societies

Association registration documents

General body resolution authorising the installation and application

Authorised signatory details

The society's own connection details for common services

Number of residential units, which sets the subsidy ceiling

Why this page exists

The three things that actually stop applications

Anyone can publish a list of documents. What stops applications is a document that does not match, and each of these three is common in Chennai, each stops an application, and each is fixable if caught early.

01

The electricity connection is in someone else's name

The problem

Very many Chennai homes still have the connection in a parent's, grandparent's or previous owner's name long after the property changed hands. Both applications are tied to the service connection, and the applicant's name must match.

The fix

A name transfer at your local TANGEDCO section office. It is inexpensive and usually takes a week or two.

You will generally need proof of ownership or transfer of the property, identity proof, the latest electricity bill and the prescribed application. Confirm the current requirement at your section office, since it can vary.

Do this first. Not midway through the application. This single step is the most common avoidable delay in Chennai rooftop solar, and it is exactly why we check it at the site survey.

02

Property ownership proof is unclear

The problem. Inherited property with paperwork never updated, joint ownership, property held in a family arrangement, or documents that do not match the name on the connection.

The fix depends on the situation, and the next section works through the common ones. The general principle: the applicant, the connection and the ownership documentation should point to the same person, and where they do not, resolve it before applying rather than partway through.

03

The bank account does not match

The problem. The subsidy is transferred to the account submitted on the portal, and a mismatch between the account name and the applicant name is the most common reason a transfer is delayed after everything else has gone right. Errors in the account details or the mandate submission are the other frequent cause.

The fix. Use an account in the applicant's own name, check every digit of the account number and IFSC before submitting, and upload a clear cancelled cheque or passbook copy.

Check this before submission, not after. By this stage the system is installed and commissioned, you have paid the installer in full, and the only thing standing between you and ₹78,000 is a form field. It is a frustrating place to lose a month.

Edge cases

Joint ownership, inherited property, flats and tenants

The property is in joint names

The application is tied to the electricity connection, so the practical answer is usually that the person whose name is on the connection applies, and the bank account should be in that same name. Where the connection is jointly held or the co-owners want the subsidy paid elsewhere, resolve it before applying. A consent or no-objection from the co-owner may be required, so confirm the current requirement.

The property is in your spouse's name

Two straightforward routes: the spouse applies as the connection holder with the subsidy paid to their account, or the connection is transferred first. Which is simpler depends on whose name is already on the connection.

The property was inherited and paperwork was never updated

This is common and it is worth resolving properly rather than working around. The connection transfer will generally require evidence of your entitlement to the property. Where succession documentation is incomplete, that is a matter to settle before starting a solar project, not during one.

You live in a flat

An individual flat owner generally cannot apply against a shared society address, because the terrace is common property. Applications submitted that way are typically rejected at feasibility. The route is a collective application through the association, with its own document set.

Exception: if your sale deed grants documented exclusive rights to a terrace, which occasionally applies to top-floor units, bring that documentation to the survey.

You are a tenant

The system is tied to both the roof and the service connection, so a tenant cannot apply unilaterally. The owner needs to be involved, and there is the practical question of a 25-year asset on a property you do not own. Solar generally makes sense for the owner rather than the occupant.

It is a commercial or industrial property

The PM Surya Ghar subsidy is residential only, so this document set does not apply. Businesses claim accelerated depreciation and GST input credit instead, which is a matter for your accountant rather than a subsidy application.

Solar subsidy in Tamil Nadu, and which route applies to you →

Do this before you begin

A five-minute pre-check

Take out your latest electricity bill and answer these four questions. It takes a few minutes and prevents most of the delays described above.

Whose name is on the electricity bill?

Can you produce property ownership documentation?

Is there a bank account in the applicant's own name?

What kind of property is it?

Where you stand

{{ pc.verdict }}

{{ pc.note }}

Do this first. {{ pc.next }}

{{ pc.cta }}

Also worth checking on the bill itself: the sanctioned load, against the system size you want. Capacity cannot exceed it, and enhancement filed late is what turns a six-week project into a twelve-week one.

Sanctioned load explained

Your part is signing

Let us do the filing

Blues Renewables files the PM Surya Ghar application and the TANGEDCO net metering application, checks the connection name and sanctioned load at the survey, files any name transfer or load enhancement in parallel, and follows the subsidy through to the money reaching your account. Your part is signing and providing bank details.

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day.

Keep your latest bill to hand for the call. The name on the connection and the sanctioned load are the two things we will want to look at first.

WhatsApp your bill
! Then the name transfer is step one, and we will tell you exactly what to take to the section office. It is inexpensive, usually takes a week or two, and doing it now rather than midway through is the difference between a smooth project and a frustrating one.

We will call you within one working day. Your details stay with us and are never sold.

Common questions

Documents, common questions

Your latest electricity bill or consumer number, identity proof, proof of property ownership or documented rights to the roof, and bank account details with a cancelled cheque for the subsidy transfer. A registered mobile number and email are needed for the portal. Housing societies additionally need registration documents, a general body resolution and authorised signatory details.

Not until it is transferred to your name. Both the subsidy and net metering applications are tied to the service connection and the applicant's name must match. A name transfer at your local TANGEDCO section office is inexpensive and usually takes a week or two, and should be done before applying.

Generally proof of ownership or transfer of the property, identity proof, the latest electricity bill and the prescribed application at your section office. Requirements can vary, so confirm at the office before making the trip.

Yes. The subsidy is transferred to the account submitted on the portal, and a mismatch between the account name and the applicant name is the most common reason a transfer is delayed after everything else has been completed correctly.

The application follows the electricity connection, so usually the person named on the connection applies and the bank account should be in that same name. Where co-owners want a different arrangement, resolve it before applying, and confirm whether a consent or no-objection from the co-owner is required.

Association registration documents, a general body resolution authorising the installation and application, authorised signatory details, the society's own electricity connection details for the common services supply, and the number of residential units, which determines the subsidy ceiling.

Not unilaterally. The system is tied to both the roof and the service connection, so the property owner must be involved. Given the asset has a 25-year life, solar generally makes sense for the owner rather than the occupant.

Largely the same connection and ownership documents, plus the technical details of the proposed system, which your installer prepares. After installation a readiness report and equipment documentation are submitted, and the commissioning certificate follows inspection and metering.

Resolve it before starting a solar project rather than during one. A connection transfer will generally require evidence of your entitlement to the property, and incomplete succession documentation is a matter to settle separately. It is worth checking at the outset rather than discovering it once a system is installed.

No, because the PM Surya Ghar subsidy is residential only and does not apply to commercial or industrial connections. Businesses claim accelerated depreciation and GST input credit instead, which is handled through the tax computation rather than a subsidy application.

Call now Free assessment