Author

Lokesh

Lokesh

Founder and Chief Executive Officer, Blues Renewables

Lokesh is the founder and chief executive of Blues Renewables and writes the guides on this blog. He covers system sizing, from a single kilowatt up to a megawatt of ground mount, TANGEDCO net metering and wheeling charges, the PM Surya Ghar subsidy, and the four ways a rooftop plant gets paid for: CAPEX, OPEX, RESCO and the power purchase agreement. His open access and group captive pieces are written for commercial and industrial users in Tamil Nadu weighing a move off the utility tariff.

Showing 49–60 of 103 articles by Lokesh

Two people shaking hands on a sunny rooftop, with rows of solar panels behind themSizing & InstallationPM Surya Ghar Agreement Format: What You Sign With Your Vendor, Clause by ClauseSeptember 27, 20269 min read

The model agreement MNRE publishes for consumer and vendor, read clause by clause. What the vendor must do, what you must do, and what to add before you sign.

Read more
Two men on a Tamil Nadu terrace, one pointing at a row of newly installed rooftop solar panels, coconut palms beyondSizing & InstallationPM Surya Ghar Vendor List: How to Find, Check and Choose a Registered VendorSeptember 27, 202611 min read

The subsidy is only paid through a vendor registered on the National Portal. Where the vendor list is, what registration proves, what it does not, and how to choose.

Read more
Aerial view of a Chennai neighbourhood with some flat roofs covered in solar panels and others bareSizing & InstallationPM Surya Ghar Eligibility: Who Can Claim the Subsidy, and Who CannotSeptember 27, 20267 min read

The scheme's actual eligibility rules from the MNRE guidelines: residential connection, DCR panels, grid connection. Tenants, SC/ST, age limit, second homes and businesses answered.

Read more
Loom Solar logo over a photograph of a person carrying a single new solar panel across a sunny home rooftopSizing & InstallationLoom Solar: Everything You Need to Know in 2026September 24, 202610 min read

The brand you buy online. What Loom Solar's Shark range costs per watt at listed prices, how its 25 to 30 year warranty reads, and what buying direct leaves out.

Read more
Saatvik logo over a photograph of a solar panel powering an irrigation pump beside a farm fieldSizing & InstallationSaatvik: Everything You Need to Know in 2026September 24, 20267 min read

Ambala's fast-scaling maker, 4.8 GW and listed since 2025. What Saatvik's N-TOPCon range delivers, its 12/25 warranty, and where it fits against Waaree.

Read more
Rayzon Solar logo over a photograph of a utility-scale solar farm at sunriseSizing & InstallationRayzon Solar: Everything You Need to Know in 2026September 24, 20268 min read

From 40 MW in 2017 to 11.3 GW. What Rayzon Solar's TOPCon range delivers, how its 30-year performance warranty reads, and where the Surat maker fits.

Read more
Emmvee logo over a photograph of bifacial solar panels on a raised ground frame over gravel in South IndiaSizing & InstallationEmmvee: Everything You Need to Know in 2026September 24, 20268 min read

Bengaluru's integrated maker, 10.3 GW of modules and 2.94 GW of own cells, listed since 2025. What Emmvee's TOPCon range delivers and who it suits.

Read more
RenewSys logo over an exploded view of a solar panel showing the glass, encapsulant film, cells and backsheet as separate layersSizing & InstallationRenewSys: Everything You Need to Know in 2026September 24, 20269 min read

The only Indian maker that builds its own encapsulant and backsheet, now at 5.6 GW. What RenewSys' TOPCon range delivers, its warranty, and who it suits.

Read more
Goldi Solar logo over an aerial photograph of a long factory roof covered with solar panelsSizing & InstallationGoldi Solar: Everything You Need to Know in 2026September 24, 20267 min read

Surat's value manufacturer, now at 15.2 GW. What Goldi Solar makes in 2026, what a Goldi system costs installed, and where it beats Waaree and Adani.

Read more
Premier Energies logo over a close-up of solar cells on a clean-room production conveyorSizing & InstallationPremier Energies: Everything You Need to Know in 2026September 23, 202610 min read

Hyderabad's cell-and-module maker, at 11.1 GW and listed since 2024. What Premier Energies' TOPCon range delivers, its 12/30 warranty, and who it suits.

Read more
Vikram Solar logo over a close-up of an all-black bifacial solar panel on a city terrace at golden hourSizing & InstallationVikram Solar: Everything You Need to Know in 2026September 23, 20269 min read

The efficiency leader among Indian makers, with a plant at Oragadam near Chennai. What Vikram Solar's Hypersol range delivers, its 12/30 warranty, and who it suits.

Read more
Tata Power Solar logo over a photograph of a technician inspecting a rooftop solar array on a Tamil Nadu terrace houseSizing & InstallationTata Power Solar: Everything You Need to Know in 2026September 23, 20269 min read

The incumbent, with a 4.3 GW plant in Tirunelveli. What Tata Power Solar makes in 2026, what its ₹2 a watt premium buys, and when it is worth paying.

Read more