Showing 85–96 of 103 articles by Lokesh
Finance ModelsWhat Is Solar Lease? What It Means in India, and What It Does NotSolar lease means three different things in India: leasing equipment, renting out your roof, and the American-style lease that is effectively unavailable.
Read more
Finance ModelsWhat Is the RESCO Model in Solar? Meaning and 9 ChecksRESCO means Renewable Energy Service Company: it funds, owns and runs the plant, then sells you the units. The same arrangement OPEX describes.
Read more
Finance ModelsWhat Is a Solar PPA? Power Purchase Agreement Clauses ExplainedA solar PPA buys electricity at an agreed rate for 15 to 25 years from a plant the developer owns. The twelve clauses, and the red flags before signing.
Read more
Finance ModelsWhat Is CAPEX Model in Solar? Costs, Tax and Payback ExplainedCAPEX means you fund and own the plant, so every unit saves the full retail tariff. GST is now 5 percent and accelerated depreciation is 40, not 80.
Read more
Finance ModelsWhat Is OPEX Model in Solar? Zero Investment Solar ExplainedLearn what the OPEX model in solar means, discover the per-unit rates and savings to expect, and read the four clauses that decide whether it pays off.
Read more
Open Access & CaptiveWho Can Use Power From a Group Captive Solar Plant? Rules ExplainedOnly shareholders can use the power. A buyer with no equity is a third party whatever the contract says, and the 26 and 51 percent tests must both hold.
Read more
Open Access & CaptiveWhat Is a Captive Solar Power Plant? The 26 and 51 Percent RulesLearn what a captive solar power plant is, how the 26 and 51 percent tests work, and discover why captive status saves about ₹2.09 per unit in Tamil Nadu.
Read more
Open Access & CaptiveSolar Power Wheeling Charges in TANGEDCO: 2026 Rates ExplainedLearn what solar power wheeling charges in TANGEDCO cost, how they differ from TANTRANSCO transmission charges, and why a capacity charge hits solar hardest.
Read more
Open Access & CaptiveCross Subsidy Surcharge (CSS) for Solar: Meaning, Formula and State-Wise RatesThe CSS charge is the cross subsidy surcharge, a per unit levy on open access consumers. Rates compared across Tamil Nadu, Karnataka and Gujarat.
Read more
Open Access & CaptiveWhat Is Open Access Solar? Charges, Rules and Real SavingsLearn what open access solar is, who qualifies in Tamil Nadu, and how the three structures change your cost per unit. See every TNERC charge with current figures.
Read more
Sizing & InstallationHow Many Solar Panels Are Required for 3 kW?How many solar panels required for 3kW: six 550 W panels is the standard build in India. Panel count by wattage, roof area, generation and cost after the ₹78,000 subsidy.
Read more
Sizing & InstallationHow to Install Solar Panels on Your Home: The Complete 2026 GuideHow to install solar panels on your home, step by step: roof checks, sizing, PM Surya Ghar subsidy up to ₹78,000, net metering, installation and commissioning.
Read more
