Author

Lokesh

Lokesh

Founder and Chief Executive Officer, Blues Renewables

Lokesh is the founder and chief executive of Blues Renewables and writes the guides on this blog. He covers system sizing, from a single kilowatt up to a megawatt of ground mount, TANGEDCO net metering and wheeling charges, the PM Surya Ghar subsidy, and the four ways a rooftop plant gets paid for: CAPEX, OPEX, RESCO and the power purchase agreement. His open access and group captive pieces are written for commercial and industrial users in Tamil Nadu weighing a move off the utility tariff.

Showing 85–96 of 103 articles by Lokesh

Large South Indian warehouse rooftop fully covered with solar panels at golden hour with the building owner looking across the arrayFinance ModelsWhat Is Solar Lease? What It Means in India, and What It Does NotSeptember 5, 20269 min read

Solar lease means three different things in India: leasing equipment, renting out your roof, and the American-style lease that is effectively unavailable.

Read more
Two Indian solar engineers inspecting rows of panels at a large industrial site in Tamil Nadu, illustrating a RESCO owning and operating a solar plantFinance ModelsWhat Is the RESCO Model in Solar? Meaning and 9 ChecksSeptember 4, 202610 min read

RESCO means Renewable Energy Service Company: it funds, owns and runs the plant, then sells you the units. The same arrangement OPEX describes.

Read more
Two Indian business professionals signing a solar power purchase agreement at a meeting table with a rooftop solar array visible through the windowFinance ModelsWhat Is a Solar PPA? Power Purchase Agreement Clauses ExplainedSeptember 4, 202611 min read

A solar PPA buys electricity at an agreed rate for 15 to 25 years from a plant the developer owns. The twelve clauses, and the red flags before signing.

Read more
Indian factory owner standing beside a rooftop solar array on their own manufacturing unit in Tamil Nadu, illustrating the CAPEX solar ownership modelFinance ModelsWhat Is CAPEX Model in Solar? Costs, Tax and Payback ExplainedSeptember 3, 202610 min read

CAPEX means you fund and own the plant, so every unit saves the full retail tariff. GST is now 5 percent and accelerated depreciation is 40, not 80.

Read more
Solar inverter and energy meter on a South Indian commercial rooftop with a technician recording a reading, illustrating the OPEX solar billing modelFinance ModelsWhat Is OPEX Model in Solar? Zero Investment Solar ExplainedSeptember 3, 202611 min read

Learn what the OPEX model in solar means, discover the per-unit rates and savings to expect, and read the four clauses that decide whether it pays off.

Read more
Aerial view of a shared ground-mounted solar farm and substation serving several separate factories in South India, illustrating a group captive solar plantOpen Access & CaptiveWho Can Use Power From a Group Captive Solar Plant? Rules ExplainedSeptember 2, 202610 min read

Only shareholders can use the power. A buyer with no equity is a third party whatever the contract says, and the 26 and 51 percent tests must both hold.

Read more
A South Indian factory beside its own fenced ground-mounted solar plant with inverter room and switchyard, illustrating a captive solar power plantOpen Access & CaptiveWhat Is a Captive Solar Power Plant? The 26 and 51 Percent RulesSeptember 1, 20269 min read

Learn what a captive solar power plant is, how the 26 and 51 percent tests work, and discover why captive status saves about ₹2.09 per unit in Tamil Nadu.

Read more
Pole mounted distribution transformer and medium voltage lines beside a Tamil Nadu factory with rooftop solar, illustrating TANGEDCO wheeling chargesOpen Access & CaptiveSolar Power Wheeling Charges in TANGEDCO: 2026 Rates ExplainedAugust 31, 202610 min read

Learn what solar power wheeling charges in TANGEDCO cost, how they differ from TANTRANSCO transmission charges, and why a capacity charge hits solar hardest.

Read more
High voltage transmission corridor crossing Indian farmland with a solar farm alongside, illustrating cross subsidy surcharge varying by stateOpen Access & CaptiveCross Subsidy Surcharge (CSS) for Solar: Meaning, Formula and State-Wise RatesAugust 29, 202613 min read

The CSS charge is the cross subsidy surcharge, a per unit levy on open access consumers. Rates compared across Tamil Nadu, Karnataka and Gujarat.

Read more
Industrial factory with rooftop solar beside a high voltage substation and a distant solar farm in Tamil Nadu, illustrating open access solar powerOpen Access & CaptiveWhat Is Open Access Solar? Charges, Rules and Real SavingsAugust 25, 202610 min read

Learn what open access solar is, who qualifies in Tamil Nadu, and how the three structures change your cost per unit. See every TNERC charge with current figures.

Read more
Six solar panels on a raised structure over a Chennai terrace, a typical 3 kW rooftop installationSizing & InstallationHow Many Solar Panels Are Required for 3 kW?August 23, 202617 min read

How many solar panels required for 3kW: six 550 W panels is the standard build in India. Panel count by wattage, roof area, generation and cost after the ₹78,000 subsidy.

Read more
Blues Renewables guide to how to install solar panels on your home, technician fitting rooftop solar modules on a Chennai terraceSizing & InstallationHow to Install Solar Panels on Your Home: The Complete 2026 GuideAugust 21, 202621 min read

How to install solar panels on your home, step by step: roof checks, sizing, PM Surya Ghar subsidy up to ₹78,000, net metering, installation and commissioning.

Read more