Blues Renewables
+91 98841 07170 Free assessment
Rooftop solar panel array in Chennai priced per kilowatt
Solar panel price in Chennai →

Installed cost per kW, what the ₹78,000 subsidy leaves you paying, and payback by system size.

Not sure which size? The calculator sizes it from your bill in two clicks.

Open the solar calculator
Residential rooftop solar installation on a Chennai house terrace
Residential solar →

Rooftop systems for Chennai homes, sized against your bill and your sanctioned load.

Commercial rooftop solar arrays across warehouse roofs in Chennai
Commercial solar →

Higher tariffs, accelerated depreciation and green audit certification. Usually a faster payback than a home.

Installation team fixing solar panels on a rooftop in Tamil Nadu
Solar solutions →

On-grid, off-grid or hybrid. Which one your site actually calls for.

Solar lighting →

Standalone lighting for gated communities, factory perimeters, schools and layouts. No meter, no TANGEDCO file.

Rooftop solar array in Chennai claimed under the PM Surya Ghar subsidy
Subsidy and approvals →

Up to ₹78,000 from PM Surya Ghar, and the TANGEDCO file we handle for you.

Rooftop solar installation in Chennai eligible for the PM Surya Ghar subsidy PM Surya Ghar in Tamil Nadu ₹30,000 / ₹60,000 / ₹78,000 slabs Rooftop solar installation connected under TANGEDCO net metering TANGEDCO net metering Four to eight weeks, filed by us Homeowner reviewing solar subsidy documents with an engineer Eligibility and documents What to keep ready before applying
! A state top-up to ₹1 lakh was announced on 5 August 2026 but is not claimable yet. The checklist below is the PM Surya Ghar and TANGEDCO file.
Solar engineer reviewing rooftop generation data on a tablet

Calculators

Work out size, cost and return before you speak to anyone.

Rooftop solar installation in Chennai by Blues Renewables
All areas in Chennai →

What changes from one part of the city to the next, and which areas we survey.

Coverage across Tamil Nadu →

Your area not listed? We survey across the whole city and metropolitan area.

Call +91 98841 07170
Call +91 98841 07170

Solar Panel Installation in Padi

Warranty terms set out separately, so you know who does what when something fails

Every solar quote mentions a twenty-five year warranty. Very few explain what happens on the day something actually fails, who you call, who pays for the labour, and how long you are without generation. Those answers are worth having before you need them.

Installing across Chennai since 2020

Two years free maintenance included

Subsidy and TANGEDCO paperwork filed by us

Free site survey and energy audit, no obligation

Engineers on a commercial roof solar plant near Chennai

Free, no obligation

Book a free survey in Padi

1 working day

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time for the Padi survey.

Send your bill now

We will call you within one working day. Your number stays with us and is never sold.

The short answer

Looking for a solar panel installation company in Padi?

Blues Renewables is a solar panel installation company working in Padi and across Chennai since 2020. We install rooftop solar for homes, apartments, businesses and industrial units, handle the PM Surya Ghar subsidy of up to ₹78,000 for households and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.

Local proof

A recent installation in Padi

Engineers on a commercial roof solar plant near Chennai

Project record

System size e.g. 5 kW
Sub-locality e.g. Padi
Roof type e.g. RCC terrace
Bill before e.g. ₹4,200 per cycle
Bill after e.g. ₹350 per cycle
Commissioned e.g. March 2026

The local picture

What actually happens when something fails

Solar equipment carries manufacturer warranties, but a warranty is a promise about the product rather than a service arrangement. When a panel or inverter fails, someone has to diagnose the fault, raise the claim with the manufacturer, remove and return the faulty item, obtain and install the replacement, and cover the labour and access costs of doing so. Which of those the manufacturer pays for, and which you or your installer do, is where most warranty disappointments originate.

The questions to ask before you buy

Who raises the claim?

A good installer handles the manufacturer relationship. Being told to contact the manufacturer yourself, in another state, is a poor outcome.

Who pays for labour and access?

Manufacturer warranties typically cover the replacement product, not the cost of getting to your roof, removing the failed unit and installing the new one. Ask explicitly.

How long will you be without generation?

Replacement modules and inverters are not always held in stock locally, and a wait of weeks is common. Ask what the installer holds and what the typical turnaround is.

What happens if the manufacturer is no longer trading?

This is a real risk over twenty-five years, and it is a reason to weigh brand stability rather than only price.

What is the installer’s own workmanship warranty?

Separate from the manufacturer’s product warranties, and for how long does it run?

Get it in writing

Panel, inverter and workmanship are three separate warranties

Three different periods. A quotation that mentions "25 year warranty" without distinguishing them is telling you very little.

Padi’s mix

Both residential and industrial work

Houses here sit on reasonable plots with mostly flat terraces, typically supporting 3 kW to 5 kW. Industrial units toward the Ambattur side have sheet roofs where condition and remaining life determine the sequence, and commercial tariffs where each displaced unit saves more but no subsidy applies.

Areas we cover around Padi: Padi, Ambattur border, Mogappair approach, Korattur, Anna Nagar West side, the industrial estate roads.

All areas we cover in Chennai →

Not sure what your site can carry?

Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.

WhatsApp 98841 07170 Book a free survey

Residential

Solar for Padi homes

Independent houses

Typically install 3 kW to 5 kW on reasonable plots.

Warranty terms

For panel, inverter and workmanship should be stated separately in the quotation.

Apartment blocks

Follow the association route for common-area systems.

Dust from nearby industry

Raises cleaning frequency.

Get a free roof survey →

Commercial and industrial

Solar for Padi businesses

Industrial units toward Ambattur

Sheet roofs, commercial tariffs, depreciation subject to taxable profit.

Warehousing and logistics

Large roof relative to load, so sizing to self-consumption matters.

Retail and showrooms

On the main roads. Evening-weighted and usually leased.

Small offices and clinics

Good daytime match.

Request an energy audit →

What we install

What we install in Padi

Rooftop solar for homes Systems from 1 kW to 10 kW, sized to your actual consumption Read more → Solar for independent houses Elevated structures up to 9 feet that keep your terrace usable Read more → Industrial solar Sheet roof and ground mount for factories and HT connections Read more → Commercial solar EPC Turnkey installations for offices, showrooms and institutions Read more → Solar for apartments and societies Common area systems with the ₹18,000 per kW society subsidy Read more → PM Surya Ghar subsidy Up to ₹78,000 for homes, filed and followed through by us Read more → Solar panel prices What a system costs in Chennai, by size Read more → Solar calculator Enter your bill, see your system size and payback Read more →

The process

How installation works

1

Free site survey

Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.

2

Design and itemised quotation

Sized against twelve months of consumption, with every component named.

3

Approvals filed

PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.

4

Installation

One to three days for a residential system, carried out by our own team rather than subcontracted.

5

Inspection and commissioning

TANGEDCO inspects, both meters go in, the system goes live.

6

Subsidy tracked to your account

And two years of maintenance included from commissioning.

We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.

Free, no obligation

Book a free survey in Padi

Quote says 25 year warranty?

Ask what the product warranty is, what the inverter warranty is, and who pays the labour when a panel fails. Those are three different answers.

What happens after you send your details

  1. We call you within one working day, and an engineer rather than a salesperson attends the site.
  2. The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
  3. You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
  4. No obligation at any point. If solar does not make sense for your property, we will say so.

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time. An engineer attends the site, not a salesperson.

Send your bill on WhatsApp

We will call you within one working day. Your number stays with us and is never sold.

Common questions

Solar in Padi, common questions

Usually the panel’s performance, meaning it will still produce a stated proportion of its original output at year 25. That is different from the product warranty against manufacturing defects, which is shorter, and different again from the inverter warranty and the installer’s workmanship warranty. Three separate things with three different periods.

The manufacturer typically replaces the product, but labour, access and installation costs are frequently not covered. Ask explicitly who raises the claim, who pays to get someone onto your roof, and how long a replacement takes to arrive. A quote saying only 25 year warranty is telling you very little.

It is a genuine risk over twenty-five years and a reason to weigh brand stability alongside price. It is also why the installer’s own workmanship warranty and their willingness to handle claims matter, since they are the party you can actually reach.

Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system, and longer for a commercial or industrial project.

Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.

Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.

Long tail coverage

Areas we cover around Padi

Padi Ambattur border Mogappair approach Korattur Anna Nagar West side the industrial estate roads

Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.

Call now Free assessment