Blues Renewables
+91 98841 07170 Free assessment
Rooftop solar panel array in Chennai priced per kilowatt
Solar panel price in Chennai →

Installed cost per kW, what the ₹78,000 subsidy leaves you paying, and payback by system size.

Not sure which size? The calculator sizes it from your bill in two clicks.

Open the solar calculator
Residential rooftop solar installation on a Chennai house terrace
Residential solar →

Rooftop systems for Chennai homes, sized against your bill and your sanctioned load.

Commercial rooftop solar arrays across warehouse roofs in Chennai
Commercial solar →

Higher tariffs, accelerated depreciation and green audit certification. Usually a faster payback than a home.

Installation team fixing solar panels on a rooftop in Tamil Nadu
Solar solutions →

On-grid, off-grid or hybrid. Which one your site actually calls for.

Solar lighting →

Standalone lighting for gated communities, factory perimeters, schools and layouts. No meter, no TANGEDCO file.

Rooftop solar array in Chennai claimed under the PM Surya Ghar subsidy
Subsidy and approvals →

Up to ₹78,000 from PM Surya Ghar, and the TANGEDCO file we handle for you.

Rooftop solar installation in Chennai eligible for the PM Surya Ghar subsidy PM Surya Ghar in Tamil Nadu ₹30,000 / ₹60,000 / ₹78,000 slabs Rooftop solar installation connected under TANGEDCO net metering TANGEDCO net metering Four to eight weeks, filed by us Homeowner reviewing solar subsidy documents with an engineer Eligibility and documents What to keep ready before applying
! A state top-up to ₹1 lakh was announced on 5 August 2026 but is not claimable yet. The checklist below is the PM Surya Ghar and TANGEDCO file.
Solar engineer reviewing rooftop generation data on a tablet

Calculators

Work out size, cost and return before you speak to anyone.

Rooftop solar installation in Chennai by Blues Renewables
All areas in Chennai →

What changes from one part of the city to the next, and which areas we survey.

Coverage across Tamil Nadu →

Your area not listed? We survey across the whole city and metropolitan area.

Call +91 98841 07170
Call +91 98841 07170

Solar Panel Installation in Nungambakkam

We tell you in one call whether your building’s roof is actually available to you

Nungambakkam runs on converted buildings. Offices in former bungalows, consulates in old houses, hotels alongside residences on the same street. It is one of the few parts of Chennai where the first solar question is almost always about who controls the roof rather than how big it is.

Installing across Chennai since 2020

Two years free maintenance included

Subsidy and TANGEDCO paperwork filed by us

Free site survey and energy audit, no obligation

Rooftop solar panels being installed on a building in Chennai

Free, no obligation

Book a free survey in Nungambakkam

1 working day

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time for the Nungambakkam survey.

Send your bill now

We will call you within one working day. Your number stays with us and is never sold.

The short answer

Looking for a solar panel installation company in Nungambakkam?

Blues Renewables is a solar panel installation company working in Nungambakkam and across Chennai since 2020. We install rooftop solar for homes, apartments, businesses and industrial units, handle the PM Surya Ghar subsidy of up to ₹78,000 for households and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.

Local proof

A recent installation in Nungambakkam

Rooftop solar panels being installed on a building in Chennai

Project record

System size e.g. 5 kW
Sub-locality e.g. Sterling Road
Roof type e.g. RCC terrace
Bill before e.g. ₹4,200 per cycle
Bill after e.g. ₹350 per cycle
Commissioned e.g. March 2026

The local picture

Converted buildings and who owns the roof

Much of Nungambakkam’s commercial activity happens in buildings that were not built for it. Offices occupy converted bungalows, consulates and institutions use older residential properties, and a single building often houses several unrelated tenants. That makes roof rights the first question in a Nungambakkam commercial enquiry, ahead of roof area, load or budget.

The three questions, in order

Do you control the roof?

A tenant occupying two floors of a converted bungalow generally does not, and a multi-tenant building’s terrace usually belongs to the owner rather than any occupant.

Is the usable area meaningful?

Converted residential buildings have terraces designed for a household, often broken up by staircase blocks, tanks and later additions.

How long is left on the lease?

A 25-year asset on a five-year lease needs the ownership and exit position documented before installation.

Where it works well in Nungambakkam

Owner-occupied commercial buildings

Where the roof is genuinely yours.

Hotels

Which typically own their premises and have both continuous load and roof area, though evening and overnight consumption limits what solar covers.

Large independent residences

Of which Nungambakkam still has many, with generous terraces and high air conditioning load.

Landlord participation

Where the building owner invests and the benefit passes through the lease.

Converted buildings

Structural condition matters more than usual

A terrace built for a residence and now supporting commercial use may already carry loads it was not designed for, including air conditioning plant added over the years. That should be assessed before an array is anchored to it.

Areas we cover around Nungambakkam: Sterling Road, Nungambakkam High Road, Khader Nawaz Khan Road, College Road, Chetpet border, Thousand Lights approach.

All areas we cover in Chennai →

Not sure what your site can carry?

Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.

WhatsApp 98841 07170 Book a free survey

Residential

Solar for Nungambakkam homes

Nungambakkam retains a substantial affluent residential base alongside its commercial activity.

Large independent houses

Typically install 5 kW to 10 kW, driven by air conditioning and often an EV.

Older properties

May have staged terrace construction or sections at different levels, which shapes the array layout.

Apartment blocks

Follow the association route for common-area systems.

Systems above 4 kW need three-phase supply

So the connection is checked at the survey.

Get a free roof survey →

Commercial and industrial

Solar for Nungambakkam businesses

Every commercial project starts with an energy audit rather than a roof measurement, because the load profile determines the system size and the roof only constrains it.

Offices in converted buildings

Excellent daytime load match, but roof rights and structural condition come first.

Hotels

Continuous load with evening and overnight peaks, so solar covers the daytime portion including laundry, kitchen and daytime cooling.

Consulates and institutions

Daytime load, and often owner-occupied, which removes the roof rights obstacle.

Showrooms and restaurants

Evening-weighted, and usually leased.

Request an energy audit →

What we install

What we install in Nungambakkam

Commercial solar EPC Turnkey installations for offices, showrooms and institutions Read more → Rooftop solar for homes Systems from 1 kW to 10 kW, sized to your actual consumption Read more → Solar for independent houses Elevated structures up to 9 feet that keep your terrace usable Read more → Solar for apartments and societies Common area systems with the ₹18,000 per kW society subsidy Read more → Solar for retail showrooms Rooftop and carport options where roof area is limited Read more → PM Surya Ghar subsidy Up to ₹78,000 for homes, filed and followed through by us Read more → Solar panel prices What a system costs in Chennai, by size Read more → Solar calculator Enter your bill, see your system size and payback Read more →

The process

How installation works

1

Free site survey

Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.

2

Design and itemised quotation

Sized against twelve months of consumption, with every component named.

3

Approvals filed

PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.

4

Installation

One to three days for a residential system, carried out by our own team rather than subcontracted.

5

Inspection and commissioning

TANGEDCO inspects, both meters go in, the system goes live.

6

Subsidy tracked to your account

And two years of maintenance included from commissioning.

We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.

Free, no obligation

Book a free survey in Nungambakkam

Not sure you control the roof?

In converted and multi tenant buildings you often do not, and that is the first thing we check. A short call saves you a wasted survey.

What happens after you send your details

  1. We call you within one working day, and an engineer rather than a salesperson attends the site.
  2. The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
  3. You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
  4. No obligation at any point. If solar does not make sense for your property, we will say so.

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time. An engineer attends the site, not a salesperson.

Send your bill on WhatsApp

We will call you within one working day. Your number stays with us and is never sold.

Common questions

Solar in Nungambakkam, common questions

Only with the property owner’s written agreement, and in many converted or multi-tenant buildings the roof is not available at all. This is the most common reason a Nungambakkam commercial enquiry does not proceed, which is why we establish it in the first conversation rather than after a survey.

Often, but the structural assessment matters more than usual. A terrace built for a residence and now supporting commercial use may already carry loads it was not designed for, including air conditioning plant added over the years. Usable area is also frequently broken up by staircase blocks, tanks and later additions.

The daytime portion, which includes laundry, kitchen and daytime cooling and is substantial. Evening and overnight consumption from guest rooms, lighting and continuous services falls outside generating hours and cannot be served by solar without storage. A load profile analysis over twelve months gives the honest figure.

Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system, and longer for a commercial or industrial project.

Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.

Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.

Long tail coverage

Areas we cover around Nungambakkam

Sterling Road Nungambakkam High Road Khader Nawaz Khan Road College Road Chetpet border Thousand Lights approach

Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.

Call now Free assessment