Solar Panel Installation in Irungattukottai
Allotment terms checked before design, so nothing stalls at approval stage
Irungattukottai is a managed SIPCOT park, and that changes one thing fundamentally: most units here occupy allotted plots on long lease rather than freehold land. Before a roof gets measured, the question is what your allotment terms say about permanent structures.
Installing across Chennai since 2020
Two years free maintenance included
Subsidy and TANGEDCO paperwork filed by us
Free site survey and energy audit, no obligation
Call us
+91 98841 07170The short answer
Looking for a solar panel installation company in Irungattukottai?
Blues Renewables is a solar panel installation company working in Irungattukottai and across Chennai since 2020. We install rooftop solar for homes, apartments, businesses and industrial units, handle the PM Surya Ghar subsidy of up to ₹78,000 for households and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.
Local proof
A recent installation in Irungattukottai
Project record
The local picture
Allotted plots and what you can build on them
Units in a SIPCOT industrial park typically occupy allotted plots held on long lease rather than owned outright, and allotment conditions frequently govern what may be built, altered or added on the plot. A rooftop solar array is a permanent structure with a 25-year design life, so establishing your position under the allotment terms is the first step, ahead of any technical assessment.
What to check before design
Your allotment or lease conditions
And whether they require approval for structural additions.
Remaining lease tenure against a 25-year asset
Where tenure is comfortable, ownership makes sense. Where it is not, the position at expiry should be documented.
Any park-level requirements
On external appearance, roof loading or electrical alterations.
Whether the building is yours or sub-leased from another allottee
Which adds a second layer of permission.
We raise this in the first conversation
It is quicker to check a document than to reverse a design
Rather than at the survey, because it determines whether the project proceeds at all.
The technical picture is standard industrial
Sheet roofs, and sizing to self-consumption
Profiled metal sheet roofs over steel purlins, where purlin spacing, frame load capacity and sheeting condition determine the design. Many units here are relatively young, so sheeting condition is less often the blocking question than in older estates. Non-domestic consumers are generally on net feed-in, so size to daytime self-consumption, and solar reduces the energy charge rather than the demand charge.
Areas we cover around Irungattukottai: SIPCOT Irungattukottai, Sriperumbudur approach, Vallam Vadagal, Mevalurkuppam, Thandalam, the NH48 stretch.
All areas we cover in Kanchipuram →Not sure what your site can carry?
Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.
Residential
Solar for Irungattukottai homes
Residential settlement here is limited and serves the industrial workforce.
Independent houses
In the surrounding villages, typically installing 2 kW to 4 kW.
Standard specification is adequate
Being well inland from the coast.
Service distance
Should be factored into the maintenance arrangement rather than discovered later.
Commercial and industrial
Solar for Irungattukottai businesses
Manufacturing units on SIPCOT plots
The core market, subject to the allotment question above.
Auto and engineering ancillaries
Supplying the Sriperumbudur belt, where supplier sustainability documentation is increasingly requested.
Warehousing and logistics
Large roof relative to load, so sizing to self-consumption matters more than filling the roof.
Support services
On the park roads.
What we install
What we install in Irungattukottai
The process
How installation works
Free site survey
Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.
Design and itemised quotation
Sized against twelve months of consumption, with every component named.
Approvals filed
PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.
Installation
One to three days for a residential system, carried out by our own team rather than subcontracted.
Inspection and commissioning
TANGEDCO inspects, both meters go in, the system goes live.
Subsidy tracked to your account
And two years of maintenance included from commissioning.
We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.
Free, no obligation
Book a free survey in Irungattukottai
On an allotted SIPCOT plot?
Then the first document to read is your allotment conditions, not a datasheet. We check that before anyone measures a roof.
What happens after you send your details
- We call you within one working day, and an engineer rather than a salesperson attends the site.
- The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
- You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
- No obligation at any point. If solar does not make sense for your property, we will say so.
Common questions
Solar in Irungattukottai, common questions
Usually, but the allotment conditions come first. Units typically occupy plots held on long lease rather than freehold, and those conditions frequently govern what may be built or altered. A solar array is a permanent structure with a 25-year design life, so we check your allotment terms and any park-level requirements before a roof is measured.
Yes. Where tenure comfortably exceeds the asset life, ownership makes sense. Where it does not, the position at expiry should be documented before installation, and an OPEX or RESCO structure aligned to the remaining term sometimes compares better than ownership.
To daytime self-consumption rather than available roof. Non-domestic consumers are generally on net feed-in rather than one-for-one net metering, so exported units earn well below the tariff paid on imports. Solar also reduces the energy charge rather than the demand charge, which on an HT connection remains substantial.
Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system, and longer for a commercial or industrial project.
Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.
Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.
Long tail coverage
Areas we cover around Irungattukottai
Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.










