Blues Renewables
Get a quote

Solar Panel Installation in Irungattukottai

Allotment terms checked before design, so nothing stalls at approval stage

Irungattukottai is a managed SIPCOT park, and that changes one thing fundamentally: most units here occupy allotted plots on long lease rather than freehold land. Before a roof gets measured, the question is what your allotment terms say about permanent structures.

Installing across Chennai since 2020

Two years free maintenance included

Subsidy and TANGEDCO paperwork filed by us

Free site survey and energy audit, no obligation

Free, no obligation

Get your figure for Irungattukottai

1 working day

We will call you within one working day with a figure. No site visit is needed for that; the survey only happens if you want to go ahead. Your number stays with us and is never sold.

The short answer

Looking for a solar panel installation company in Irungattukottai?

Irungattukottai is industrial, and a factory roof is a structural question first: purlin spacing and sheet condition decide the design before any panel is chosen. Air here carries more dust than most of the city, which means soiling losses and a cleaning schedule worth quoting honestly. Installing across Chennai since 2020, we file the PM Surya Ghar application worth up to ₹78,000 for households, handle TANGEDCO net metering end to end, and cover two years of maintenance after commissioning. Before the survey, you can check the solar panel price in Chennai for 3 kW to 10 kW systems and see how our solar panel installation in Chennai works, the same process we follow in Irungattukottai.

Installation crew carrying a solar panel across a terrace in Irungattukottai, Chennai
Our crew on a terrace in Irungattukottai.

What it costs here

A typical 5 kW system in Irungattukottai

Solar panels on a farmhouse metal roof near Irungattukottai

Standard 5 kW example

What a typical 5 kW home system does here. Commercial and industrial connections are quoted differently and do not receive the subsidy.

System size5 kW, about 9 panels
Roof area usedabout 250 sq ft, shade-free
Generationabout 22 units a day
Bill beforeabout ₹9,000 per bi-monthly cycle
Bill afterAbout ₹500 to ₹1,100, mostly the network charge
Cost after subsidyabout ₹2.20 lakh after both subsidies

Not sure what your site can carry?

Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.

The local picture

Allotted plots and what you can build on them

Units in a SIPCOT industrial park typically occupy allotted plots held on long lease rather than owned outright, and allotment conditions frequently govern what may be built, altered or added on the plot. A rooftop solar array is a permanent structure with a 25-year design life, so establishing your position under the allotment terms is the first step, ahead of any technical assessment.

What to check before design

Your allotment or lease conditions

And whether they require approval for structural additions.

Remaining lease tenure against a 25-year asset

Where tenure is comfortable, ownership makes sense. Where it is not, the position at expiry should be documented.

Any park-level requirements

On external appearance, roof loading or electrical alterations.

Whether the building is yours or sub-leased from another allottee

Which adds a second layer of permission.

We raise this in the first conversation

It is quicker to check a document than to reverse a design

Rather than at the survey, because it determines whether the project proceeds at all.

The technical picture is standard industrial

Sheet roofs, and sizing to self-consumption

Profiled metal sheet roofs over steel purlins, where purlin spacing, frame load capacity and sheeting condition determine the design. Many units here are relatively young, so sheeting condition is less often the blocking question than in older estates. Non-domestic consumers are generally on net feed-in, so size to daytime self-consumption, and solar reduces the energy charge rather than the demand charge.

Areas we cover around Irungattukottai: SIPCOT Irungattukottai, Sriperumbudur approach, Vallam Vadagal, Mevalurkuppam, Thandalam, the NH48 stretch.

All areas we cover in Kanchipuram →

Residential

Solar for Irungattukottai homes

Residential settlement here is limited and serves the industrial workforce.

Independent houses

In the surrounding villages, typically installing 3 kW to 4 kW.

Standard specification is adequate

Being well inland from the coast.

Service distance

Should be factored into the maintenance arrangement rather than discovered later.

Get a free roof survey →

Commercial and industrial

Solar for Irungattukottai businesses

Manufacturing units on SIPCOT plots

The core market, subject to the allotment question above.

Auto and engineering ancillaries

Supplying the Sriperumbudur belt, where supplier sustainability documentation is increasingly requested.

Warehousing and logistics

Large roof relative to load, so sizing to self-consumption matters more than filling the roof.

Support services

On the park roads.

Request an energy audit →

Local guide

Irungattukottai factory roofs: sizing solar against the park's anchor plant

Hyundai Motor India opened its first plant at Irungattukottai in 1998, and it now has a capacity of 8,50,000 vehicles a year. Its own rooftop project gives SIPCOT units here a useful local benchmark for how much roof a kilowatt really takes.

Pincode602117 (Irungattukottai post office)
District / talukKanchipuram district, Sriperumbudur taluk
Anchor plantHyundai Motor India, operating since 1998, capacity 8,50,000 vehicles a year
Industrial estateSIPCOT industrial complex with a footwear SEZ, and India's first private air freight station (soft launch 17 July 2015)
LocationAbout 34 km from central Chennai on the Chennai to Bengaluru highway
District solar yieldAbout 1,600 units per kW a year (Kancheepuram)

A roof area benchmark from the park's largest plant

Hyundai was installing a 1.9 MWp rooftop system on a module factory roof of 13,028 sq m. That works out to about 7 sq m of roof per kW, or roughly 74 sq ft, including walkways and gaps. Use it as a first check before any survey: a clear sheet roof of 1,000 sq m can carry roughly 140 to 145 kW, subject to purlin capacity and sheeting condition. At the Kancheepuram yield of 1,600 units per kW a year, 140 kW would make about 2,24,000 units a year. Whether that much is worth installing depends on how much of it your unit uses in working hours. A roof with skylights every few bays loses part of that area, so measure the clear zones, not the gross roof.

Rooftop for the base, open access for the rest

Hyundai's Indian operation said that in 2022 it received about 85% of its electricity as green power from external plants, with rooftop solar on top. The same logic applies at smaller scale. A rooftop array covers part of a daytime load. Units whose consumption is many times what their roof can supply should look at captive or open access solar for the balance, and use the roof for the share it can serve directly. Rooftop exports from a non-domestic connection earn only ₹3.61 a unit up to 10 kW and ₹3.37 from 11 to 150 kW, so the roof should be sized to self-consumption. The first step is twelve months of bills, which show the daytime share of your load.

Homes in the villages around the park

Workforce housing in the surrounding villages is mostly independent houses, and many rooms and houses are let to workers. The subsidies go to the person whose name is on the electricity connection, so in a let house the owner, not the tenant, decides on solar. At 1,600 units per kW a year, a 3 kW system makes about 4,800 units a year, and it costs about ₹2,10,000 before subsidy and about ₹1,10,000 after both subsidies. These houses are well inland, but dust from heavy park traffic means cleaning every two to three weeks in the dry months. Homes above 4 kW need three-phase supply, which can be filed alongside net metering.

What we install

What we install in Irungattukottai

The process

How installation works

1

Free site survey

Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.

2

Design and itemised quotation

Sized against twelve months of consumption, with every component named.

3

Approvals filed

PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.

4

Installation

One to three days for a residential system, carried out by our own team rather than subcontracted.

5

Inspection and commissioning

TANGEDCO inspects, the net meter goes in, the system goes live.

6

Subsidy tracked to your account

And two years of maintenance included from commissioning.

We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.

Free, no obligation

What will it cost on your roof in Irungattukottai?

On an allotted SIPCOT plot?

Then the first document to read is your allotment conditions, not a datasheet. We check that before anyone measures a roof.

What happens after you send your details

  1. We call you within one working day, and an engineer rather than a salesperson attends the site.
  2. The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
  3. You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
  4. No obligation at any point. If solar does not make sense for your property, we will say so.

We will call you within one working day with a figure. No site visit is needed for that; the survey only happens if you want to go ahead. Your number stays with us and is never sold.

Common questions

Solar in Irungattukottai, common questions

Can a SIPCOT unit install rooftop solar on an allotted plot?

Usually, but the allotment conditions come first. Units typically occupy plots held on long lease rather than freehold, and those conditions frequently govern what may be built or altered. A solar array is a permanent structure with a 25-year design life, so we check your allotment terms and any park-level requirements before a roof is measured.

Does remaining lease tenure affect the decision?

Yes. Where tenure comfortably exceeds the asset life, ownership makes sense. Where it does not, the position at expiry should be documented before installation, and an OPEX or RESCO structure aligned to the remaining term sometimes compares better than ownership.

How should an Irungattukottai unit size its system?

To daytime self-consumption rather than available roof. Non-domestic consumers are generally on net feed-in rather than one-for-one net metering, so exported units earn well below the tariff paid on imports. Solar also reduces the energy charge rather than the demand charge, which on an HT connection remains substantial.

How long does installation take in Irungattukottai?

Eight to fourteen weeks for the industrial and commercial connections typical of Irungattukottai, against six to ten for a home. HT connections need more approval steps, and the work is usually phased around your shifts rather than done in one run.

Do you handle the subsidy and TANGEDCO paperwork?

Yes for residential connections. Note that the PM Surya Ghar subsidy does not apply to commercial or industrial connections, which is the position for most properties in Irungattukottai. For those we file the TANGEDCO net feed-in application and provide the documentation your accountant needs for accelerated depreciation instead.

What is included after installation?

Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.

How much roof does a SIPCOT unit in Irungattukottai need per kW?

About 7 sq m per kW on a clear sheet roof, based on Hyundai's 1.9 MWp system on 13,028 sq m. Skylights, ridge vents and walkways reduce what is usable. The purlin spacing and frame capacity then decide whether that area can carry the load.

Can an Irungattukottai factory combine rooftop solar with open access?

Yes. Large users commonly cover part of the load from the roof and buy the rest as green power through captive or open access arrangements. Rooftop works best sized to what the unit consumes during the day, since exports earn far less than the tariff.

Long tail coverage

Areas we cover around Irungattukottai

SIPCOT IrungattukottaiSriperumbudur approachVallam VadagalMevalurkuppamThandalamthe NH48 stretch

Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.