Solar Panel Installation in Sholinganallur
Societies here claim ₹18,000 per kW, so a 20 kW common area system carries ₹3,60,000 in subsidy
Sholinganallur is newer than most of Chennai, and that works in solar’s favour. Buildings here generally have sound structural capacity, unobstructed terraces and modern electrical infrastructure. The dominant opportunity is not individual homes but apartment associations and offices, where the systems are larger and the subsidy route is different.
Installing across Chennai since 2020
Two years free maintenance included
Subsidy and TANGEDCO paperwork filed by us
Free site survey, no obligation
Call us
+91 98841 07170The short answer
Looking for a solar panel installation company in Sholinganallur?
Blues Renewables is a solar panel installation company working across Sholinganallur and the rest of Chennai since 2020. We install rooftop solar for homes, apartments, businesses and institutions, handle the PM Surya Ghar subsidy of up to ₹78,000 and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.
Local proof
A recent installation in Sholinganallur
Project record
The local picture
Why the OMR corridor is different
Sholinganallur and the surrounding OMR stretch are dominated by apartment complexes, gated communities and IT offices rather than independent houses. That changes almost everything about how a solar project runs here: the decision is made by a committee or a facilities manager rather than a homeowner, the systems are larger, and the subsidy route for a society is ₹18,000 per kW rather than the ₹78,000 household cap.
What is easier here than in older parts of Chennai
Structural capacity
Newer buildings generally take an array without needing assessment work first.
Clear terraces
Less obstruction from ad hoc construction than older stock, though tanks and lift machine rooms still constrain layout.
Modern electrical infrastructure
So sanctioned load and phase are less often a surprise.
And what is harder
Decision timelines run in months rather than weeks, terrace access matters to residents so an elevated structure is often what makes a proposal acceptable, and multiple blocks with separate connections may need designing as more than one system.
Worth knowing before the committee meets
EV charging is a genuine factor here
Sholinganallur has high EV adoption, and associations are increasingly installing charging points. The common-area subsidy provision explicitly covers EV charging infrastructure, which is worth knowing before a committee treats them as separate projects.
Areas we cover within Sholinganallur: ELCOT SEZ, Semmancheri, Karapakkam, Navalur, Perumbakkam, the OMR service road stretch.
All areas we cover in Chennai →Not sure what your roof can carry?
Send us a photo of your latest EB bill on WhatsApp and we will come back with your system size, the subsidy you qualify for and an estimated saving. No visit required to get that first answer.
Residential
Solar for Sholinganallur homes
Apartment associations
The main opportunity. Common-area systems covering lifts, pumps, STP, corridor and compound lighting, and EV charging points. A 40-flat building has subsidy headroom far beyond 10 kW at ₹18,000 per kW.
Gated community villas
Individual roofs, individual connections, usually 3 kW to 6 kW, though architectural control rules may apply so check the community bye-laws.
Individual flat owners
Generally cannot install on a shared terrace. Propose it to the association instead, and we will prepare the load assessment free for the committee.
Commercial
Solar for Sholinganallur businesses
The OMR corridor’s commercial base is IT offices, tech parks, and the retail and food service that supports them.
IT offices
Consumption falls squarely in working hours, close to an ideal solar match, and commercial tariffs make each displaced unit worth more.
Tech parks and larger premises
Commercial EPC scope, starting with an energy audit rather than a roof measurement.
Retail and restaurants
Evening-weighted, and usually leased, so roof rights come first.
What we install
What we install in Sholinganallur
The process
How installation works
Free site survey
Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.
Design and itemised quotation
Sized against twelve months of consumption, with every component named.
Approvals filed
PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.
Installation
One to three days for a residential system, carried out by our own team rather than subcontracted.
Inspection and commissioning
TANGEDCO inspects, both meters go in, the system goes live.
Subsidy tracked to your account
And two years of maintenance included from commissioning.
We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.
Free, no obligation
Book a free survey in Sholinganallur
Think your association will never agree?
We prepare the load assessment and savings projection free, in a format your secretary can put straight to the general body.
What happens after you send your details
- We call you within one working day, and an engineer rather than a salesperson comes to the site.
- The survey is free and takes under an hour. We measure shade free area across the day, check your connection name and sanctioned load, and photograph the roof.
- You get an itemised quotation naming every component and brand, the subsidy applied, and the net figure.
- No obligation at any point. If solar does not make sense for your property, we will say so.
Common questions
Solar in Sholinganallur, common questions
Through the association rather than through individual owners, since the terrace is common property. The association installs a common-area system covering lifts, pumps, the STP, corridor and compound lighting, and EV charging points, and claims subsidy at ₹18,000 per kW up to 500 kW, subject to 3 kW per flat.
Yes. The common-area provision explicitly covers EV charging infrastructure alongside lighting, lifts and pumps, which is worth knowing before a committee treats solar and EV charging as separate projects with separate approvals.
Longer than a household installation, because the general body resolution is usually the longest step and is entirely society-dependent. We prepare the load assessment and savings projection free so the committee has real figures to put to members, then the technical timeline runs six to twelve weeks depending on system size and connection work.
Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system.
Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.
Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.
Long tail coverage
Areas we cover within Sholinganallur
Not listed? We survey across the whole city and the metropolitan area. Call and we will tell you straight away whether we can reach your address this week.










