Blues Renewables
Get a quote

Solar Panel Installation in Thirumazhisai

Skylights and purlins surveyed, so the quote reflects the roof you actually have

Industrial and warehouse roofs here are almost all profiled sheet, and most of them carry translucent skylight panels. Those skylights cannot be built over, and where they sit determines how much of the roof is genuinely available.

Installing across Chennai since 2020

Two years free maintenance included

Subsidy and TANGEDCO paperwork filed by us

Free site survey and energy audit, no obligation

Free, no obligation

Get your figure for Thirumazhisai

1 working day

We will call you within one working day with a figure. No site visit is needed for that; the survey only happens if you want to go ahead. Your number stays with us and is never sold.

The short answer

Looking for a solar panel installation company in Thirumazhisai?

Most of what we install in Thirumazhisai goes on independent houses, where the terrace belongs to the same person as the electricity connection and nothing needs a committee. Because it is a newer area, roofs here are generally in good condition and the paperwork moves faster than the average. We have installed across Chennai since 2020, file the PM Surya Ghar subsidy of up to ₹78,000 for households and the TANGEDCO net metering application ourselves, and include two years of free maintenance. Before the survey, you can check the solar panel price in Chennai for 3 kW to 10 kW systems and see how our solar panel installation in Chennai works, the same process we follow in Thirumazhisai.

An earthing pit lid and copper earthing strip beside a rooftop solar structure leg, rooftop solar in Thirumazhisai
An on-grid rooftop array in Thirumazhisai.

What it costs here

A typical 5 kW system in Thirumazhisai

Split solar array on a red tiled terrace in Thirumazhisai

Standard 5 kW example

What a typical 5 kW home system does, on a terrace that can take one. Your own figures come from the survey.

System size5 kW, about 9 panels
Roof area usedabout 250 sq ft, shade-free
Generationabout 22 units a day
Bill beforeabout ₹9,000 per bi-monthly cycle
Bill afterAbout ₹500 to ₹1,100, mostly the network charge
Cost after subsidyabout ₹2.20 lakh after both subsidies

Not sure what your site can carry?

Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.

The local picture

Skylights, and the roof you actually have

Most industrial and warehouse buildings use profiled sheet roofing with translucent skylight panels set into it at intervals to provide daylight inside. Those panels cannot carry a solar array and cannot be covered, since covering them defeats their purpose and darkens the working space below. On a roof with regularly spaced skylights, the genuinely usable area for solar can be substantially less than the roof plan suggests.

What the roof survey establishes

Skylight positions and spacing

And how much contiguous sheet area remains between them.

Whether the array can span skylights

On a raised structure without shading them. Sometimes it can, provided the daylight below remains adequate, and sometimes the shading defeats the purpose.

Purlin positions and spacing

Which determine where the mounting can actually fix. Fixings go into structure, not into sheeting.

Sheet condition and remaining life

Which decides whether the roof is dealt with before or after the array, along with roof slope and orientation, since a sheet roof array follows the roof plane.

The daylight trade-off is worth taking seriously

Skylights reduce daytime lighting load, which is itself a saving

Covering them to gain array area can increase artificial lighting consumption, partly offsetting what the extra panels generate. On a building with substantial daytime occupancy that is a real calculation rather than a theoretical one.

The commercial rules apply as everywhere

Size to daytime self-consumption

Non-domestic consumers are generally on net feed-in rather than one-for-one net metering, so exported units earn well below what the unit pays on imports. Solar reduces the energy charge, not the demand charge, which is levied on contract or recorded maximum demand.

Areas we cover around Thirumazhisai: Thirumazhisai, Poonamallee approach, Mangadu border, Nemilichery, Nazarathpet, the industrial estate roads.

All areas we cover in Tiruvallur →

Residential

Solar for Thirumazhisai homes

Independent houses on layout plots

Typically install 3 kW to 5 kW.

Larger plots

Make elevated structures practical where the terrace is used.

Outer-circle approval timelines

Apply, so applications are filed in parallel.

Apartment blocks

Follow the association route for common-area systems.

Get a free roof survey →

Commercial and industrial

Solar for Thirumazhisai businesses

Industrial and warehouse units

Sheet roofs with skylights, where usable area needs surveying rather than estimating.

Logistics operations on the corridor

Large roof relative to load, so sizing to self-consumption matters.

Small manufacturing

Modest roofs, commercial tariffs, and depreciation subject to taxable profit.

Retail and service businesses

On the main roads.

Request an energy audit →

Local guide

Thirumazhisai solar: industrial estate floods and a planned new town

During Cyclone Michaung in December 2023, every unit in the Thirumazhisai Industrial Estate had water up to two feet inside, after surplus from Nemam and Chembarambakkam lakes was diverted towards it.

Pincode600124
Local bodyThirumazhisai Town Panchayat, Poonamallee taluk, Tiruvallur district
Industrial estateOver 300 units inside the estate and about 600 outside it
Flood exposureTwo feet inside estate units and four to seven feet on surrounding roads in December 2023
PlanningCMDA new town plan covering 34.10 sq km across 17 villages, around the Kuthambakkam bus terminus
State yield figureThiruvallur district, about 1,600 units per kW a year

What December 2023 means for equipment placement

The Hindu and BusinessLine reported that the estate was among the worst hit in Chennai, with surrounding areas under six to seven feet of water at the peak and people rescued by boat. The New Indian Express reported about 200 units affected and losses put near ₹200 crore, after lake water was diverted towards the estate to protect homes. For a sheet-roof unit here, we mount string inverters on the roof structure or a mezzanine wall, keep the solar LT panel and any combiner boxes well above two feet, and route cables along the building rather than through floor trenches. Ask for this to be shown on the single-line diagram before signing.

A planned new town around the bus terminus

CMDA's 2025 to 2045 plan treats Thirumazhisai as a high-density, mixed-use hub served by NH-48, the Outer Ring Road, a proposed metro corridor and the Kuthambakkam bus terminus. Its land pooling notice covers 1,605.75 acres for a 30 metre loop road, returning 60% of pooled land to owners as regular plots with drains and roads. For anyone building on those plots, solar is cheapest when designed in: a three-phase connection if the load will exceed 4 kW, a conduit from terrace to meter, and a slab designed for an elevated structure. Retrofitting the same provisions later costs more.

Sizing a sheet-roof unit on the Thiruvallur yield

The state rooftop calculator gives Thiruvallur district about 1,600 units per kW a year, roughly 4.4 a day. A 25 kW array on a small manufacturing unit makes about 40,000 units a year, about 110 on a clear day. Units used on site save your full tariff; exports are credited at ₹3.37 a unit between 11 and 150 kW. If the unit's daytime draw on working days is well above 110 units, the system pays back mostly through self-consumption. If it is well below, choose a smaller array, because surplus exports earn far less than the tariff each self-used unit saves.

Homes in the town panchayat

Outside the estate, much of Thirumazhisai is houses on layout plots, and the domestic rules are the same as in Chennai. On the Thiruvallur yield, a 3 kW system makes about 4,800 units a year, around 800 in each bi-monthly cycle. It costs about ₹2,10,000 before subsidy and about ₹1,10,000 after the central and Tamil Nadu subsidies for an eligible home. Domestic connections pay no fixed charge, so the remaining bill is mostly the network charge on generation, about ₹0.32 a unit. Homes keep net metering up to their sanctioned load, and above 4 kW need three-phase supply.

What we install

What we install in Thirumazhisai

The process

How installation works

1

Free site survey

Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.

2

Design and itemised quotation

Sized against twelve months of consumption, with every component named.

3

Approvals filed

PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.

4

Installation

One to three days for a residential system, carried out by our own team rather than subcontracted.

5

Inspection and commissioning

TANGEDCO inspects, the net meter goes in, the system goes live.

6

Subsidy tracked to your account

And two years of maintenance included from commissioning.

We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.

Free, no obligation

What will it cost on your roof in Thirumazhisai?

Quoted from a roof plan?

On a sheet roof with skylights the usable area is well under the plan area. We survey the roof before pricing anything.

What happens after you send your details

  1. We call you within one working day, and an engineer rather than a salesperson attends the site.
  2. The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
  3. You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
  4. No obligation at any point. If solar does not make sense for your property, we will say so.

We will call you within one working day with a figure. No site visit is needed for that; the survey only happens if you want to go ahead. Your number stays with us and is never sold.

Common questions

Solar in Thirumazhisai, common questions

Do skylights reduce how much solar fits on a warehouse roof?

Usually yes, and sometimes substantially. Translucent skylight panels cannot carry an array and covering them darkens the space below. On a roof with regularly spaced skylights the genuinely usable contiguous area can be well under what the roof plan suggests, which is why the survey measures rather than estimates.

Can we build over the skylights?

Sometimes, on a raised structure that spans them without fully shading them, provided daylight below remains adequate. But skylights reduce daytime lighting load, which is itself a saving, so covering them can increase artificial lighting consumption and partly offset what the extra panels generate. It is a real calculation on an occupied building.

Where can the mounting be fixed on a sheet roof?

Into the purlins, which are the structural members beneath the sheeting, not into the sheets themselves. Purlin spacing and section therefore determine where fixings can go and how the array is laid out, alongside the skylight positions. That is established at the roof survey.

How long does installation take in Thirumazhisai?

Six to eight weeks from survey to a live, net-metered system is typical in Thirumazhisai, and newer areas often land at the shorter end because connection records are current. The installation itself is one to three days for a home; the rest is TANGEDCO approval and the meter.

Do you handle the subsidy and TANGEDCO paperwork?

Yes, both are ours to file. Applications from newer areas like Thirumazhisai usually move faster because the connection details and sanctioned load are recent and correct. We still verify the name on the connection and the load at the survey, then track the subsidy to your bank account after commissioning.

What is included after installation?

Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.

Our unit in Thirumazhisai Industrial Estate flooded in 2023. Where should the solar inverters go?

Off the floor. String inverters can be fixed to the roof structure or a mezzanine wall, with the LT panel and combiner boxes raised well above the 2023 water level, so a repeat flood stops production but not the solar plant.

We own a plot in the Thirumazhisai land pooling area. Should we plan solar now or wait?

Plan it into the building design now, even if you install later. A three-phase connection, a terrace-to-meter conduit and a slab ready for an elevated structure cost little during construction and save rework afterwards.

Long tail coverage

Areas we cover around Thirumazhisai

ThirumazhisaiPoonamallee approachMangadu borderNemilicheryNazarathpetthe industrial estate roads

Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.