Solar Panel Installation in Medavakkam
Most homes here install 3 kW to 5 kW, with payback often four to five years
Medavakkam has been built out over roughly two decades, and it shows on almost every street. A house from the early 2000s sits next to one finished last year. For solar that matters more than it sounds, because the structural assessment that suits one is meaningless for the other.
Installing across Chennai since 2020
Two years free maintenance included
Subsidy and TANGEDCO paperwork filed by us
Free site survey and energy audit, no obligation
Call us
+91 98841 07170The short answer
Looking for a solar panel installation company in Medavakkam?
Blues Renewables is a solar panel installation company working in Medavakkam and across Chennai since 2020. We install rooftop solar for homes, apartments, businesses and industrial units, handle the PM Surya Ghar subsidy of up to ₹78,000 for households and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.
Local proof
A recent installation in Medavakkam
Project record
The local picture
Two decades of building on the same street
Medavakkam’s rapid and continuous growth means building age varies dramatically within a single street rather than by neighbourhood. Older houses from the early phase of development frequently have terraces built in stages, with sections added over the years, while recent construction has uniform slabs and modern electrical infrastructure. The structural assessment therefore has to be done property by property rather than assumed from the locality.
What the survey establishes here
Slab age and condition
Including whether the terrace was built in one pour or extended in phases. Staged construction can mean varying slab thickness across the same roof, which affects where an array can be anchored.
Sanctioned load and phase
Older connections in the early-phase streets often have lower sanctioned load than the household now uses, requiring an enhancement before a system of 4 kW or more can be commissioned.
Parapet and headroom shading
More pronounced on the older self-built properties where staircase blocks were added later.
Waterproofing condition
If an older terrace already leaks, deal with it before installation. Removing an array to repair waterproofing costs considerably more than doing it first.
The low-lying factor
Parts of Medavakkam sit close to the Pallikaranai marsh
The panels are safe on the roof, but the inverter, distribution boxes and protection equipment should be mounted at a height that accounts for the area’s water logging history, and cable routing planned away from low points. It costs nothing extra when decided before installation.
Why payback lands at the faster end
Consumption here is high
Households commonly sit above the 500 unit bi-monthly threshold where Tamil Nadu’s telescopic tariff cuts the free-unit allowance and reprices consumption into higher slabs. Those are the units solar displaces first.
Areas we cover around Medavakkam: Medavakkam main road, Jalladianpet, Perumbakkam approach, Sithalapakkam, Nanmangalam border, Velachery Main Road.
All areas we cover in Chennai →Not sure what your site can carry?
Send us your last electricity bill on WhatsApp and we will come back with an indicative system size and what it would offset. No visit needed for that first answer.
Residential
Solar for Medavakkam homes
Independent houses
The core market, typically 3 kW to 5 kW, though roof condition rather than consumption often sets the practical size on older properties.
Apartment blocks
Follow the association route for common-area systems at ₹18,000 per kW.
Newer gated communities
May carry architectural control rules, so check the bye-laws before committing to a design.
Older properties
Need the waterproofing and slab condition question answered before anything else.
Commercial and industrial
Solar for Medavakkam businesses
Medavakkam’s commercial base serves its residential population rather than operating independently.
Clinics and diagnostic centres
Daytime load matching generation, and equipment that makes power quality a legitimate design question.
Showrooms and retail
Along the main road. Evening-weighted trading, and roof rights first on leased premises.
Schools and coaching institutions
Strong term-time daytime match, with the vacation affecting sizing.
Small offices and service businesses
Good daytime match and commercial tariffs, so payback is typically faster than residential.
What we install
What we install in Medavakkam
The process
How installation works
Free site survey
Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.
Design and itemised quotation
Sized against twelve months of consumption, with every component named.
Approvals filed
PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.
Installation
One to three days for a residential system, carried out by our own team rather than subcontracted.
Inspection and commissioning
TANGEDCO inspects, both meters go in, the system goes live.
Subsidy tracked to your account
And two years of maintenance included from commissioning.
We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.
Free, no obligation
Book a free survey in Medavakkam
Not sure if your older terrace can take it?
That is the right question. Staged construction means slab thickness can vary across the same roof, and we check before quoting rather than after.
What happens after you send your details
- We call you within one working day, and an engineer rather than a salesperson attends the site.
- The survey is free. We measure usable area and shading, check your connection and sanctioned load, and photograph the site.
- You get an itemised quotation naming every component and brand, with the subsidy or depreciation position set out.
- No obligation at any point. If solar does not make sense for your property, we will say so.
Common questions
Solar in Medavakkam, common questions
Because it varies house to house rather than by neighbourhood. A terrace from the early 2000s built in stages can have varying slab thickness across the same roof, which affects where an array can be anchored, while recent construction has uniform slabs and modern connections. The assessment has to be done property by property.
The panels do not, since they sit on the roof, but the inverter and protection equipment can. Parts of Medavakkam sit close to the Pallikaranai marsh and have a history of water logging, so that equipment should be mounted at a height accounting for it and cable routing planned away from low points. It costs nothing extra when decided beforehand.
Because consumption is high. Many households here sit above 500 units per bi-monthly cycle, where Tamil Nadu’s telescopic tariff cuts the free-unit allowance and reprices consumption into higher slabs. Solar displaces those expensive units first, so each generated unit is worth more than it would be for a lower-consumption household.
Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system, and longer for a commercial or industrial project.
Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.
Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.
Long tail coverage
Areas we cover around Medavakkam
Not listed? We survey across Chennai and the surrounding districts. Call and we will tell you straight away whether we can reach your site this week.










