Blues Renewables
+91 98841 07170 Free assessment
Rooftop solar panel array in Chennai priced per kilowatt
Solar panel price in Chennai →

Installed cost per kW, what the ₹78,000 subsidy leaves you paying, and payback by system size.

Not sure which size? The calculator sizes it from your bill in two clicks.

Open the solar calculator
Residential rooftop solar installation on a Chennai house terrace
Residential solar →

Rooftop systems for Chennai homes, sized against your bill and your sanctioned load.

Commercial rooftop solar arrays across warehouse roofs in Chennai
Commercial solar →

Higher tariffs, accelerated depreciation and green audit certification. Usually a faster payback than a home.

Installation team fixing solar panels on a rooftop in Tamil Nadu
Solar solutions →

On-grid, off-grid or hybrid. Which one your site actually calls for.

Solar lighting →

Standalone lighting for gated communities, factory perimeters, schools and layouts. No meter, no TANGEDCO file.

Rooftop solar array in Chennai claimed under the PM Surya Ghar subsidy
Subsidy and approvals →

Up to ₹78,000 from PM Surya Ghar, and the TANGEDCO file we handle for you.

Rooftop solar installation in Chennai eligible for the PM Surya Ghar subsidy PM Surya Ghar in Tamil Nadu ₹30,000 / ₹60,000 / ₹78,000 slabs Rooftop solar installation connected under TANGEDCO net metering TANGEDCO net metering Four to eight weeks, filed by us Homeowner reviewing solar subsidy documents with an engineer Eligibility and documents What to keep ready before applying
! A state top-up to ₹1 lakh was announced on 5 August 2026 but is not claimable yet. The checklist below is the PM Surya Ghar and TANGEDCO file.
Solar engineer reviewing rooftop generation data on a tablet

Calculators

Work out size, cost and return before you speak to anyone.

Rooftop solar installation in Chennai by Blues Renewables
All areas in Chennai →

What changes from one part of the city to the next, and which areas we survey.

Coverage across Tamil Nadu →

Your area not listed? We survey across the whole city and metropolitan area.

Call +91 98841 07170
Call +91 98841 07170

Solar Panel Installation in Tambaram

Larger plots here take 5 kW to 8 kW, cutting ₹4,000 to ₹7,000 a month

Tambaram has the plot sizes Chennai’s inner suburbs lost decades ago. Independent houses with genuine terrace area, room for elevated structures, and consumption to match. It is also a commercial centre in its own right, which means a solar enquiry here is as likely to come from a showroom or a clinic as from a household.

Installing across Chennai since 2020

Two years free maintenance included

Subsidy and TANGEDCO paperwork filed by us

Free site survey, no obligation

Rooftop solar installation in Chennai by Blues Renewables

Free, no obligation

Book a free survey in Tambaram

1 working day

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time for the Tambaram survey.

Send your EB bill now

We will call you within one working day. Your number stays with us and is never sold.

The short answer

Looking for a solar panel installation company in Tambaram?

Blues Renewables is a solar panel installation company working across Tambaram and the rest of Chennai since 2020. We install rooftop solar for homes, apartments, businesses and institutions, handle the PM Surya Ghar subsidy of up to ₹78,000 and the TANGEDCO net metering application end to end, and include two years of free maintenance with every installation.

Local proof

A recent installation in Tambaram

Rooftop solar installation in Chennai by Blues Renewables

Project record

System size e.g. 5 kW
Sub-locality e.g. East Tambaram
Roof type e.g. RCC terrace
EB bill before e.g. ₹4,200 per cycle
EB bill after e.g. ₹350 per cycle
Commissioned e.g. March 2026

The local picture

Larger plots, larger systems, and the three-phase question

Tambaram, Selaiyur and the surrounding suburbs have significantly larger residential plots than most of central Chennai, which means larger usable terraces and systems that commonly run 5 kW and above. That size threshold matters procedurally: TANGEDCO supplies three-phase above 4,000 watts of connected load, so most Tambaram installations involve either an existing three-phase connection or a phase conversion.

What that means for your timeline

Phase conversion is a separate TANGEDCO application

And it must be complete before the solar system can be commissioned.

Filed alongside the net metering application, the two run in parallel

Filed afterwards, a six-week project becomes twelve. We check your connection at the survey specifically to avoid this.

Sanctioned load enhancement

Is often needed too, for the same reason and with the same fix.

Outlying areas

Properties toward Mudichur, Perungalathur and Vandalur are further from both the coast and the metro. Standard specification is generally adequate, and access for installation is usually straightforward.

The second Tambaram factor

Space makes elevated structures genuinely practical

Larger terraces mean households that use the space for drying, storage or functions can keep it. Raising the array up to 9 feet leaves the space walkable and shaded, and it improves generation by letting air move under the panels.

Areas we cover within Tambaram: East Tambaram, West Tambaram, Selaiyur, Chitlapakkam, Irumbuliyur, Camp Road, Mudichur, Perungalathur.

All areas we cover in Chennai →

Not sure what your roof can carry?

Send us a photo of your latest EB bill on WhatsApp and we will come back with your system size, the subsidy you qualify for and an estimated saving. No visit required to get that first answer.

WhatsApp 98841 07170 Book a free survey

Residential

Solar for Tambaram homes

Independent houses

The majority here, typically installing 4 kW to 8 kW depending on air conditioning and pump load.

Elevated structures

More practical here than in tighter localities, and worth costing if you use your terrace.

Gated communities

In Selaiyur and toward Medavakkam, following the association route for common areas, or individual roofs where villas have their own connections.

Get a free roof survey →

Commercial

Solar for Tambaram businesses

Tambaram is a commercial centre serving the whole southern suburb belt: showrooms along the GST Road and station approaches, hospitals and clinics, colleges, and light industry toward the outskirts.

Showrooms and retail

Evening trading, so solar covers the daytime portion, and roof rights on leased frontage need checking.

Hospitals and clinics

Continuous load, with solar sitting alongside existing DG and UPS rather than replacing them.

Colleges and schools

Strong daytime match, with vacation periods affecting how a campus should be sized.

Light industry

Sheet roofs, higher connected loads, and often an HT connection, which changes the economics and the design.

Request a commercial energy audit →

What we install

What we install in Tambaram

Rooftop solar for homes Systems from 1 kW to 10 kW, sized to your actual consumption Read more → Solar for independent houses Elevated structures up to 9 feet that keep your terrace usable Read more → Commercial solar EPC Turnkey installations for offices, showrooms and institutions Read more → Solar for retail showrooms Rooftop and carport options where roof area is limited Read more → Industrial solar Sheet roof and ground mount for factories and HT connections Read more → PM Surya Ghar subsidy Up to ₹78,000 for homes, filed and followed through by us Read more → Solar panel prices What a system costs in Chennai, by size Read more → Solar calculator Enter your bill, see your system size and payback Read more →

The process

How installation works

1

Free site survey

Shade-free roof area measured across the day, structure checked, connection name and sanctioned load confirmed.

2

Design and itemised quotation

Sized against twelve months of consumption, with every component named.

3

Approvals filed

PM Surya Ghar and TANGEDCO net metering, plus load enhancement or phase conversion in parallel where needed.

4

Installation

One to three days for a residential system, carried out by our own team rather than subcontracted.

5

Inspection and commissioning

TANGEDCO inspects, both meters go in, the system goes live.

6

Subsidy tracked to your account

And two years of maintenance included from commissioning.

We check the name on your electricity connection at the survey, because a mismatch stops more applications than any technical issue. See what to keep ready.

Free, no obligation

Book a free survey in Tambaram

Put off by the three phase conversion?

We file it alongside your net metering application so the two run in parallel. Filed separately it adds six weeks. Filed together it adds almost nothing.

What happens after you send your details

  1. We call you within one working day, and an engineer rather than a salesperson comes to the site.
  2. The survey is free and takes under an hour. We measure shade free area across the day, check your connection name and sanctioned load, and photograph the roof.
  3. You get an itemised quotation naming every component and brand, the subsidy applied, and the net figure.
  4. No obligation at any point. If solar does not make sense for your property, we will say so.

Request received

Thanks, {{ leadName }}.

We will call {{ leadMobile }} within one working day to fix a time. An engineer attends the survey, not a salesperson.

Send your EB bill on WhatsApp

We will call you within one working day. Your number stays with us and is never sold.

Common questions

Solar in Tambaram, common questions

Probably, if the system is 5 kW or larger. TANGEDCO supplies three-phase above 4,000 watts of connected load, and Tambaram’s larger plots mean larger systems. The phase conversion is a separate application that must complete before commissioning, so it should be filed alongside the net metering application rather than after it.

Often yes, because plots here are large enough that the terrace is genuinely used. Raising the array up to 9 feet keeps the space walkable and shaded underneath, lets the array span above water tanks and headrooms, and improves generation because the panels run cooler with airflow beneath them. It costs more than a low mount, and we state the difference before you decide.

Yes. Those areas are straightforward for installation, generally with good access and larger plots. Standard specification is adequate that far inland, without the coastal hardware required nearer the sea.

Six to ten weeks from survey to a live, net-metered system, with TANGEDCO approval and meter installation the main variable. The installation itself is one to three days for a residential system.

Yes. We file the PM Surya Ghar application and the TANGEDCO net metering application, follow both through the section office, and track the subsidy to your bank account. We also check the name on your electricity connection at the survey, since a mismatch stops applications more often than any technical issue.

Two years of free maintenance from commissioning, covering panel cleaning, annual inspection of connections and structure, generation monitoring and warranty coordination with the manufacturer.

Long tail coverage

Areas we cover within Tambaram

East Tambaram West Tambaram Selaiyur Chitlapakkam Irumbuliyur Camp Road Mudichur Perungalathur

Not listed? We survey across the whole city and the metropolitan area. Call and we will tell you straight away whether we can reach your address this week.

Call now Free assessment